The Resource Cost growth and delivery delays in submarine construction at Electric Boat are likely to continue, report by the Comptroller General of the United States

Cost growth and delivery delays in submarine construction at Electric Boat are likely to continue, report by the Comptroller General of the United States

Label
Cost growth and delivery delays in submarine construction at Electric Boat are likely to continue
Title
Cost growth and delivery delays in submarine construction at Electric Boat are likely to continue
Statement of responsibility
report by the Comptroller General of the United States
Creator
Subject
Language
eng
Cataloging source
GPO
Government publication
federal national government publication
Index
no index present
Literary form
non fiction
http://bibfra.me/vocab/lite/organizationName
United States
http://library.link/vocab/subjectName
  • General Dynamics Corporation
  • Submarines (Ships)
  • Shipbuilding
Label
Cost growth and delivery delays in submarine construction at Electric Boat are likely to continue, report by the Comptroller General of the United States
Instantiates
Publication
Note
  • Cover title
  • "April 19, 1982."
  • "B-203670"--Prelim. p
  • "MASAD-82-29."
Control code
ocm09139458
Dimensions
28 cm.
Extent
v, 33 p.
System control number
  • (Sirsi) o09139458
  • (Sirsi) BEW-5612
  • (GPO)83007387
Label
Cost growth and delivery delays in submarine construction at Electric Boat are likely to continue, report by the Comptroller General of the United States
Publication
Note
  • Cover title
  • "April 19, 1982."
  • "B-203670"--Prelim. p
  • "MASAD-82-29."
Control code
ocm09139458
Dimensions
28 cm.
Extent
v, 33 p.
System control number
  • (Sirsi) o09139458
  • (Sirsi) BEW-5612
  • (GPO)83007387

Library Locations

    • CLEVELAND/Main LibraryBorrow it
      325 Superior Ave., N.E., Cleveland, OH, 44114, US
      41.501174 -81.69177499999999
Processing Feedback ...